Volume 9, Issue 8 (August 2022), Pages: 72-78
----------------------------------------------
Original Research Paper
Reliability analysis of captive power plant system where the working of standby unit depends on connecting unit
Author(s): Sharma Upasana, Singh Avtar *
Affiliation(s):
Department of Statistics, Punjabi University, Patiala, India
Full Text - PDF XML
* Corresponding Author.
Corresponding author's ORCID profile: https://orcid.org/0000-0002-7543-0238
Digital Object Identifier:
https://doi.org/10.21833/ijaas.2022.08.009
Abstract:
Captive power plants usually operate parallel to the gridline to overcome the losses associated with power failures. While the connectivity of the power plant and gridline highly depends on the functioning of the electrical breaker. This study reveals the importance of connecting device breakers in a captive power plant to operate the system at full or reduced capacity and safer it from reverse feeding. Using semi-Markov processes reliability model is developed for steam turbine generators interconnected with gridline by an electric breaker. The expressions are formed for reliability measures like mean time to system failure, availability, busy period, and profit using regenerative point techniques. Also, these measures are evaluated numerically using an actual dataset belonging to a captive power plant. Graphical plotting shows a decline in profit with increasing the failure rates of turbine generators, gridline, and working probability of breaker. The revenue per unit uptime of the system is forecasted to get productive profit with different failure rates of the power generator.
© 2022 The Authors. Published by IASE.
This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).
Keywords: Turbine generator, Breaker, Regeneration process, Semi-Markov process, Captive power plant, Reliability measures
Article History: Received 16 February 2022, Received in revised form 20 May 2022, Accepted 20 May 2022
Acknowledgment
No Acknowledgment.
Compliance with ethical standards
Conflict of interest: The author(s) declared no potential conflicts of interest with respect to the research, authorship, and/or publication of this article.
Citation:
Upasana S and Avtar S (2022). Reliability analysis of captive power plant system where the working of standby unit depends on connecting unit. International Journal of Advanced and Applied Sciences, 9(8): 72-78
Permanent Link to this page
Figures
Fig. 1 Fig. 2 Fig. 3 Fig. 4 Fig. 5
Tables
Table 1 Table 2 Table 3
----------------------------------------------
References (10)
- Bhardwaj RK, Kaur M, and Singh R (2021). MTSF and profit analysis of a cold-standby system with unstable switching device and Weibull distribution. International Journal of Statistics and Reliability Engineering, 7(3): 435-444. [Google Scholar]
- Huang L and Xu Q (2010). Lifetime reliability for load-sharing redundant systems with arbitrary failure distributions. IEEE Transactions on Reliability, 59(2): 319-330. https://doi.org/10.1109/TR.2010.2048679 [Google Scholar]
- Mathew AG, Rizwan SM, Majumder MC, Ramachandran KP, and Taneja G (2010). Comparative analysis between profits of the two models of a CC plant. In the AIP Conference Proceedings: International Conference on Modeling, Optimization and Computing, National Institute of Technology, Durgapur, India, 1298(1): 226-231. https://doi.org/10.1063/1.3516306 [Google Scholar]
- Naithani A, Parashar B, Bhatia PK, and Taneja G (2017). Probabilistic analysis of a 3-unit induced draft fan system with one warm standby with priority to repair of the unit in working state. International Journal of System Assurance Engineering and Management, 8(2): 1383-1391. https://doi.org/10.1007/s13198-017-0608-6 [Google Scholar]
- Parashar B and Taneja G (2007). Reliability and profit evaluation of a PLC hot standby system based on a master-slave concept and two types of repair facilities. IEEE Transactions on Reliability, 56(3): 534-539. https://doi.org/10.1109/TR.2007.903151 [Google Scholar]
- Rajesh GT and Prasad J (2018). Reliability and availability analysis for a three-unit gas turbine power generating system with seasonal effect and FCFS repair pattern. International Journal of Applied Engineering Research, 13(12): 10948-10964. [Google Scholar]
- Rizwan VM, Padmavathi N, Pal A, and Taneja G (2013). Reliability analysis of a seven unit desalination plant with shutdown during winter season and repair/maintenance on FCFS basis. International Journal of Performability Engineering, 9(5): 523-539. [Google Scholar]
- Sharma U and Kaur J (2016). Study of two units standby system with one essential unit to increase its functioning. International Journal of Engineering Trends and Technology, 33(11): 97-100. https://doi.org/10.14445/22315381/IJETT-V35P304 [Google Scholar]
- Singh D and Taneja G (2014). Reliability and economic analysis of a power generating system comprising one gas and one steam turbine with random inspection. Journal of Mathematics and Statistics, 10(4): 436-442. https://doi.org/10.3844/jmssp.2014.436.442 [Google Scholar]
- Taneja G and Prasad J (2020). Reliability and profit analysis of a power generating system with effect of ambient temperature and priority for repair to the gas turbine over steam turbine on system failure. In: Kapur P, Singh G, Klochkov Y, and Kumar U (Eds.), Decision analytics applications in industry: 309-330. Springer, Singapore, Singapore. https://doi.org/10.1007/978-981-15-3643-4_24 [Google Scholar]
|