International journal of

ADVANCED AND APPLIED SCIENCES

EISSN: 2313-3724, Print ISSN:2313-626X

Frequency: 12

line decor
  
line decor

 Volume 5, Issue 11 (November 2018), Pages: 75-79

----------------------------------------------

 Original Research Paper

 Title: Determination of construction supplier evaluation criteria using word tags

 Author(s): Phong Thanh Nguyen *

 Affiliation(s):

 Department of Project Management, Faculty of Civil Engineering, Ho Chi Minh City Open University (HCMCOU), Ho Chi Minh City, Vietnam

 https://doi.org/10.21833/ijaas.2018.11.010

 Full Text - PDF          XML

 Abstract:

The construction material is one of the critical factors to create products from construction processes. Proper evaluation and selection of building material supplier can increase product quality, reduce defects and costs, etc. To select good material suppliers, defining core criteria for evaluating them is one of the most important economic decisions in the success of any construction contractors. In Vietnam, however, there have not been many publications related to the evaluation and selection criteria of material suppliers. For this reason, this study presents an overview of the criteria for evaluating and selecting construction material supplier based on the reference of domestic and foreign documentation combining in-depth interviews with construction professionals. The research data collected through expert interviews were qualitatively analyzed by word tags. The results show that the five most important criteria are price, quality, number of projects involvement, ability to deliver on time, and supplier relationship. 

 © 2018 The Authors. Published by IASE.

 This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).

 Keywords: Construction contractor, Evaluation, Selection criteria, Material supplier, Word tags

 Article History: Received 20 June 2018, Received in revised form 5 September 2018, Accepted 19 September 2018

 Digital Object Identifier: 

 https://doi.org/10.21833/ijaas.2018.11.010

 Citation:

 Nguyen PT (2018). Determination of construction supplier evaluation criteria using word tags. International Journal of Advanced and Applied Sciences, 5(11): 75-79

 Permanent Link:

 http://www.science-gate.com/IJAAS/2018/V5I11/Nguyen.html

----------------------------------------------

 References (31) 

  1. Bache J, Carr R, Parnaby J, and Tobias AM (1987). Supplier development systems. International Journal of Technology Management, 2(2): 219-228.   [Google Scholar]
  1. Barrett SA, Spillane JP, and Lim JB (2013). Early implementation of building information modeling into a cold-formed steel company: providing novel project management techniques and solutions to industry. American Journal of Civil Engineering and Architecture, 1(6): 164-173.   [Google Scholar]
  1. Chang SL, Wang RC, and Wang SY (2007). Applying a direct multi-granularity linguistic and strategy-oriented aggregation approach on the assessment of supply performance. European Journal of Operational Research, 177(2): 1013-1025. https://doi.org/10.1016/j.ejor.2006.01.032   [Google Scholar]
  1. Chengter H, Phuong MN, and Ming HS (2007). Supplier evaluation and selection criteria in the construction industry of Taiwan and Vietnam. International Journal on Information and Management Sciences, 18(4): 403-426.   [Google Scholar]
  1. Dickson GW (1966). An analysis of vendor selection systems and decisions. Journal of Purchasing, 2(1): 5-17. https://doi.org/10.1111/j.1745-493X.1966.tb00818.x   [Google Scholar]
  1. Do ST, Likhitruangsilp V, Kiet TT, and Nguyen PT (2017). Risk assessment for international construction joint ventures in Vietnam. International Journal of Advanced and Applied Sciences, 4(6): 104-114. https://doi.org/10.21833/ijaas.2017.06.015   [Google Scholar]
  1. Eshtehardian E, Ghodousi P, and Bejanpour A (2013). Using ANP and AHP for the supplier selection in the construction and civil engineering companies; case study of Iranian company. KSCE Journal of Civil Engineering, 17(2): 262-270. https://doi.org/10.1007/s12205-013-1141-z   [Google Scholar]
  1. Ghodsypour SH and O'Brien C (1998). A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming. International Journal of Production Economics, 56: 199-212. https://doi.org/10.1016/S0925-5273(97)00009-1   [Google Scholar]
  1. Huang SH and Keskar H (2007). Comprehensive and configurable metrics for supplier selection. International Journal of Production Economics, 105(2): 510-523. https://doi.org/10.1016/j.ijpe.2006.04.020   [Google Scholar]
  1. Ismaile S and Alhosban F (2018). Students perceptions of audience response system in classroom feedback: A qualitative study. International Journal of Advanced and Applied Sciences, 5(4): 67-72. https://doi.org/10.21833/ijaas.2018.04.008   [Google Scholar]
  1. Jin Y (2017). Development of word cloud generator software based on python. Procedia Engineering, 174: 788-792. https://doi.org/10.1016/j.proeng.2017.01.223   [Google Scholar]
  1. Juhantila OP and Virolainen VM (2003). Buyers' expectation from suppliers. In the 19th IMP-conference in Lugano, Switzerland: 1-25. Available online at: https://www.impgroup.org/paper_view.php?viewPaper=4361
  1. Kannan VR and Tan KC (2002). Supplier selection and assessment: Their impact on business performance. Journal of Supply Chain Management, 38(3): 11-21. https://doi.org/10.1111/j.1745-493X.2002.tb00139.x   [Google Scholar]
  1. Khan RA, Gazder U, and Qayoom A (2017). Comparison of delay factors and remedies' rankings for building construction projects in developing countries. International Journal of Advanced and Applied Sciences, 4(4): 33-42. https://doi.org/10.21833/ijaas.2017.04.006   [Google Scholar]
  1. Lambert DM and Pohlen TL (2001). Supply chain metrics. The International Journal of Logistics Management, 12(1): 1-19. https://doi.org/10.1108/09574090110806190   [Google Scholar]
  1. Monczka RM, Handfield RB, Giunipero LC, and Patterson JL (2015). Purchasing and supply chain management. Cengage Learning, Boston, USA.   [Google Scholar]  PMid:25422273
  1. Monczka RM, Petersen KJ, Handfield RB, and Ragatz GL (1998). Success factors in strategic supplier alliances: the buying company perspective. Decision Sciences, 29(3): 553-577. https://doi.org/10.1111/j.1540-5915.1998.tb01354.x   [Google Scholar]
  1. Nguyen PT and Likhitruangsilp V (2017). Identification risk factors affecting concession period length for public-private partnership infrastructure projects. International Journal of Civil Engineering and Technology, 8(6): 342-348.   [Google Scholar]
  1. Nguyen PT, Likhitruangsilp, V., and Onishi, M. (2017a). Developing a stochastic traffic volume prediction model for public-private partnership projects. In the American Institute of Physics Conference Series, AIP Publishing, USA, 1903(1): 060010. https://doi.org/10.1063/1.5011564   [Google Scholar]
  1. Nguyen PT, Nguyen NV, Pham HL, Nguyen AT, Nguyen QTTHL, and Huynh DBV (2018). Application of supply chain management in construction industry. Advances in Science and Technology Research Journal, 12(2): 11-19. https://doi.org/10.12913/22998624/92112   [Google Scholar]
  1. Nguyen PT, Phuc VN, and Quyen TTHLN (2017b). Application of fuzzy analytic network process and TOPSIS method for material supplier selection. Key Engineering Materials, 728: 411-415. https://doi.org/10.4028/www.scientific.net/KEM.728.411   [Google Scholar]
  1. Nguyen TA, Nguyen PT, and Vachara P (2015). Explaining model for supervisor's behavior on safety action based on their perceptions. Journal of Engineering and Applied Sciences, 10(20): 9562-9572.   [Google Scholar]
  1. Plebankiewicz E and Kubek D (2015). Multicriteria selection of the building material supplier using AHP and fuzzy AHP. Journal of Construction Engineering and Management, 142(1): 04015057. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001033   [Google Scholar]
  1. Shih KH, Hung HF, and Lin B (2009). Supplier evaluation model for computer auditing and decision-making analysis. Kybernetes, 38(9): 1439-1460. https://doi.org/10.1108/03684920910991469   [Google Scholar]
  1. Stanley LL and Wisner JD (2001). Service quality along the supply chain: implications for purchasing. Journal of Operations Management, 19(3): 287-306. https://doi.org/10.1016/S0272-6963(00)00052-8   [Google Scholar]
  1. Ting SC and Cho DI (2008). An integrated approach for supplier selection and purchasing decisions. Supply Chain Management: An International Journal, 13(2): 116-127. https://doi.org/10.1108/13598540810860958   [Google Scholar]
  1. Tracey M and Vonderembse MA (2000). Building supply chains: A key to enhancing manufacturing performance. American Journal of Business, 15(2): 11-20. https://doi.org/10.1108/19355181200000007   [Google Scholar]
  1. Tran TT (2017). An empirical research on selecting the targeted suppliers and purchasing process of supermarket. International Journal of Advanced and Applied Sciences, 4(4): 96-109. https://doi.org/10.21833/ijaas.2017.04.015   [Google Scholar]
  1. Tullous R and Munson JM (1991). Trade‐offs under uncertainty: Implications for industrial purchasers. International Journal of Purchasing and Materials Management, 27(3): 24-31. https://doi.org/10.1111/j.1745-493X.1991.tb00537.x   [Google Scholar]
  1. Wang JW and Guo SW (2007). Research of construction supplier selection model based on grey relevancy. Journal of Wuhan University of Technology, 29(3): 153-156.   [Google Scholar]
  1. Weber CA, Current JR, and Benton WC (1991). Vendor selection criteria and methods. European journal of Operational Research, 50(1): 2-18. https://doi.org/10.1016/0377-2217(91)90033-R   [Google Scholar]